ANG Repair Aircraft Maintenance Hangar

Kingsley Field-Klamath Falls, Oregon 

Renovation of shop spaces within an existing 75,600 SF maintenance hangar. The project began with documenting the existing use and condition of the spaces in an A-1 Project Book. This demonstrated inefficiencies and provided a way to expand shop spaces within the same footprint. Three concepts were presented in an on-site charrette, during which a consensus was reached. These concepts are documented in an A-2 Project Book. Following the A-2 Project Book were B-1 Design Development services, B-2 Pre-final Design services, B-3 Final Design services, and Construction services.

Includes improvements and reconfiguring of space on the first floor as well as replacing the HVAC system for the second floor. Existing rooms will be relocated to accommodate for a new central Break Room and ADA compliant Men’s and Women’s Locker Rooms, and a new Tool Room. Upgrades to Hangar bays will include resurfacing the floors, providing 400Hz power in the each bay, and retrofitting all four existing hangar doors. 

 

ANG Repair Building 360

Portland, Oregon

Renovation to 11,000 SF of an existing 1985 precast concrete and steel structure building to accommodate the personnel and operations of the 125th Special Tactics Squadron. As a sub-consultant to AECOM, AKS participated in an initial field investigation to document existing conditions and an on-site charrette to develop alternative concept layouts for the interior renovations and scope of other project elements as a part of the ANG A-1 Project Book. As a part of the A-2 Project Book, concepts were further refined with ultimately one concept selected by the ANG to be developed into B-1, B-2, and B-3 construction documents. Interior renovations to meet the 125th Special Tactics Squadron AFE Parachute Packing program include, office space, break room, heritage room, parachute packing space with 14’ ceilings for parachute inspections, cargo parachute packing, and secure conference room. Other facility repairs include upgrades to the existing mechanical and electrical systems in the renovated spaces, complete replacement of the existing metal roof, and exterior painting to match the Base Standard color scheme.

B360 Concept.jpg